Okay, slightly confusing question I'm looking to get cleared up.
Currently have: 6ml Test P. 10ml Test E.
Will either purchase: One 10ml Test P OR 10ml Test E.
Currently have been running Test P for 8 weeks. Started a log, but then realised I was too lazy to maintain it so I didn't bother. Will delete soon. Anyway. Im going overseas for a week on Feb 10th. Obviously I can take neither AAS or post cycle therapy (pct) over with me, so my plan is to run Test up until then, then when I get back start post cycle therapy (pct). Obviously, Test P isn't accommodating of this as post cycle therapy (pct) commences three days after the conclusion of a Test P cycle. So note I've got some Test E. Also, for all of Jan I'm planning to run a small amount of Tren A (A. so i can hopefully see results, B. So I can assess side effects for further use).
Currently my plan is this. For next 4 weeks running Test E @ 500mg. Then weeks 4 - 8 running Prop @ 350mg with Tren (whatever dose the one vial of Tren A allows, probably fairly low). Then week 8 - 9 running one more week of E @ 500mg. Week 9 - 11 overseas then week 11 - 15 start post cycle therapy (pct).
Is there a better alternative to this? I've been advised I have the option of front loading E now so it kicks in faster, then running it for next 8 weeks, splitting it with prop until it runs out.
So what is better option?
A) Get 1 more vial of Test E, split it with last 6ml of Test P until that runs out then just pin E for 8 weeks?
B) Get 1 more vial of Test P, run that from weeks 4-8 and E from 1 - 4 and 8 - 9?
I'm struggling to interpret this, so hoping you guys can.
Cheers.
Currently have: 6ml Test P. 10ml Test E.
Will either purchase: One 10ml Test P OR 10ml Test E.
Currently have been running Test P for 8 weeks. Started a log, but then realised I was too lazy to maintain it so I didn't bother. Will delete soon. Anyway. Im going overseas for a week on Feb 10th. Obviously I can take neither AAS or post cycle therapy (pct) over with me, so my plan is to run Test up until then, then when I get back start post cycle therapy (pct). Obviously, Test P isn't accommodating of this as post cycle therapy (pct) commences three days after the conclusion of a Test P cycle. So note I've got some Test E. Also, for all of Jan I'm planning to run a small amount of Tren A (A. so i can hopefully see results, B. So I can assess side effects for further use).
Currently my plan is this. For next 4 weeks running Test E @ 500mg. Then weeks 4 - 8 running Prop @ 350mg with Tren (whatever dose the one vial of Tren A allows, probably fairly low). Then week 8 - 9 running one more week of E @ 500mg. Week 9 - 11 overseas then week 11 - 15 start post cycle therapy (pct).
Is there a better alternative to this? I've been advised I have the option of front loading E now so it kicks in faster, then running it for next 8 weeks, splitting it with prop until it runs out.
So what is better option?
A) Get 1 more vial of Test E, split it with last 6ml of Test P until that runs out then just pin E for 8 weeks?
B) Get 1 more vial of Test P, run that from weeks 4-8 and E from 1 - 4 and 8 - 9?
I'm struggling to interpret this, so hoping you guys can.
Cheers.