Finally back on cycle..any critique?

Bigballerr

New member
This will be my 4th cycle, last one ended about 2 years ago and finally jumping back on. Anyways im 23 6 ft 215 11% fat.
This is my first cycle with tren which is where I wanted anyone to clarify dosing.

1-15 Test E 750/wk
8-15 blend of test p/masteron/tren ace 75 each (150) total will shoot 1ml EOD

adex .5 ED (previous existing gyno want to avoid flare up)
prami on hand even tho i puke it up every night

PCT on hand of course
 
you want to run 1000 mg of test on your first go around with Tren ? low dose of test with tren is usually a good choice for your first Tren run (like 300 mg test a week with 75mg tren eod).

your blend with the mast in it is a waste .. there is not enough masteron in there for anything . Masteron needs to be ran 600+mg a week,, that blend is only giving you like 300 a week. AND unfortunately the only way to get to the 600mg range means you have to increase the test prop and tren at the same time.
blends suck, imo.

run a separate low dose of test, with masteron at 600+ a week, and a separate bottle of tren ace to run EOD.

also, 8 weeks of masteron is not enough either .. might as well do a full run cycle (12 weeks+) of Test, Tren, Mast --- not sure why your waiting until week 8 to start mast and tren ,, AND your going to start test Prop mid cycle .. test prop should be used as a front load, not mid cycle
 
you want to run 1000 mg of test on your first go around with Tren ? low dose of test with tren is usually a good choice for your first Tren run (like 300 mg test a week with 75mg tren eod).

your blend with the mast in it is a waste .. there is not enough masteron in there for anything . Masteron needs to be ran 600+mg a week,, that blend is only giving you like 300 a week. AND unfortunately the only way to get to the 600mg range means you have to increase the test prop and tren at the same time.
blends suck, imo.

run a separate low dose of test, with masteron at 600+ a week, and a separate bottle of tren ace to run EOD.

also, 8 weeks of masteron is not enough either .. might as well do a full run cycle (12 weeks+) of Test, Tren, Mast --- not sure why your waiting until week 8 to start mast and tren ,, AND your going to start test Prop mid cycle .. test prop should be used as a front load, not mid cycle

Man where did you come up with this cycle. Look at what Roush said ^^^ he hit about everything I would say. This is a major disaster. No forethought. The Tren blend is crap, junk.
:Pat: If I say anything more I'll just be repeating Roush.
 
Back
Top