bdomihizayka
New member
Hey guys. I started my first cycle about 6 weeks ago (12 week total planned). 500mg test e/ week. I am up about 25lbs, and stayed at this weight for a bit over a week.
Here's the problem.... as soon as my last pin is scheduled, I have a flight for a job training course lined up, completely unplanned before I started.... in a different country.... I would be away for exactly 2 weeks.
Should I cut my cycle short now and begin PCT? I know the test is still going to be in my system, but I am very nervous about loosing all my gains in this period knowing I would be eating not so well and have absolutely limited access to a gym if any....
Or will the test in my system be enough to ride it out those 2 last weeks between my last pin and pct, so that muscle catabolism would be no problem for me?
Any advice is appreciated.
Here's the problem.... as soon as my last pin is scheduled, I have a flight for a job training course lined up, completely unplanned before I started.... in a different country.... I would be away for exactly 2 weeks.
Should I cut my cycle short now and begin PCT? I know the test is still going to be in my system, but I am very nervous about loosing all my gains in this period knowing I would be eating not so well and have absolutely limited access to a gym if any....
Or will the test in my system be enough to ride it out those 2 last weeks between my last pin and pct, so that muscle catabolism would be no problem for me?
Any advice is appreciated.